Pipeline Prefabrication

Release time:2020-11-03 15:05:49

Prefabricationof the main process.1) Material Inspection and Testing Material Inspections and Tests2) Downhill port Pippe Cutting and Bevelling (material traceability identification mark)3) Assembly P

Prefabricationof the main process.

1) Material Inspection and Testing Material Inspections and Tests

2) Downhill port Pippe Cutting and Bevelling (material traceability identification mark)

3) Assembly Point Welding Pool Fit up (?Assembly Record)

4) Welding and non-destructive testing Welding and NDE (weld traceability and welding records)

5) Hydrostatic testing for hydrostatic testing (s)

6) Surface treatment surface treatment.

7) Packing shipping Delivery Packing.

Reference standards.

ASME B31.1 and B31.3.

API 1104.

ASME BPV SEC IX.

图片关键词

图片关键词

图片关键词


 

             


contact us

Address: No. 3, Jinhe Road, Sino-French Industrial Cooperation Park, Qinshan Avenue, Haiyan County, Zhejiang Province

Jiaxing Jcc Piping Engineering & Construction Co.,Ltd 136 66781 911

tel:0573-86213001

E-mail:jcccsh-business@jcccsh.com
xueliang.li@jcccsh.com

Tel
Product
Message
Home